|
Creating your own colour with NBT Colour Concentrate and NBT Emulsion
1. Shake l litre Colour Concentrate vigorously.
2. Pour Colour Concentrate into 4 litre tub of Emulsion.
3. Whisk/Stir till colour is completely blended
Add 1/3.
4. Apply to your surface
5. If paint is too thick – add small amount of water.
6. After 6 – 8 hours apply second coat.
Note: For further information refer to our Technical Information
Sheets.
Creating your
own colour with NBT Pigments and NBT Casein Paint
1. Place Casein powder in a container
2. Add powder Pigment and stir
3. Add enough warm water to make a paste, leave for 15 minutes.
4. Add more warm water and whisk to a 'single cream' consistency, leave
for 15 minutes, if too thick add more water.
5. Apply a thin coat to your surface – becomes opaque when dry
6. After 2 hours apply second thin coat – surface becomes transparent
but will dry opaque
Note: For further information refer to our Technical Information
Sheets and Special Effects Sheets
Creating your own colour with NBT Colour Concentrate and NBT
Casein Paint
1. Place Casein powder in a container
2. Add enough warm water to make a paste
3. Add Colour Concentrate and whisk well – leave for 15 minutes
4. Add more warm water and whisk to a 'single cream' consistency, leave
for 15 minutes, if too thick add more water.
5. Apply a thin coat to your surface – becomes opaque when dry
6. After 2 hours apply second thin coat – surface becomes transparent
but will dry opaque
Note: Using Colour Concentrate will reduce the breathability
of the Casein. For further information refer to our Technical Information
Sheets and Special Effects Sheets.
Creating your own colour with NBT Pigments and NBT Emulsion
1. Soak NBT Pigment in a little water for 12 –24 hours
2. Use no more than 500g Pigment to 4 litres in Brilliant White Emulsion
3. Use no more than 1.5kg Pigment to 4 litres of Low Titanium Emulsion
4. Pour Pigment mixture into Emulsion
1. Whisk/Stir till colour is completely blended
2. Apply to your surface
3. If paint is too thick – add small amount of water
4. After 6 – 8 hours apply second coat
Note: For further information refer to our Technical Information
Sheets and Special Effects Sheets
|