Here our team was tasked with installing a GEOCELL and Limecrete floor.
This property is located in an area that suffers with severe flooding, for this reason you will see in the photo’s that a DPM has been used as a precautionary measure.
The GEOCELL will still act as the functional moisture management layer below the DPM. Any rising moisture or water wont affect the foam glass as it will be able to drain away again and the GEOCELL will dry and be left unaffected.
You will notice that the walls were also knocked back. This is because our team also installed our Cork board insulation which will be finished off with a lime plaster.
VIDEO CLIPS OF LEVELLING & COMPACTING GEOCELL: